Signage for a New Commercial Tenant: What to Plan Before You Open

signage for new commercial tenant
You’ve signed the lease. The interior drawings are moving. Contractors are starting work. Furniture has been ordered. The website is being updated. Opening day suddenly feels real. Then someone asks, “What are we doing for the sign?” That’s much later than signage should enter the conversation.

Permanent commercial signage can involve:
• Landlord approval
• Site measurements
• Design
• Existing-sign removal
• Municipal review
• Sign permits
• Engineering
• Electrical preparation
• Fabrication
• Lift equipment
• Installation scheduling

If you wait until the interior renovation is nearly complete to start planning exterior signage, there’s a very real possibility the permanent sign won’t be ready for opening day. For a new commercial tenant, signage should be treated as part of the opening project, not as decoration added at the end.

This guide explains what new tenants should plan, what information to get from the landlord, what signs may be required throughout the property & when each step should happen.

Start Thinking About Signage Before You Sign the Lease

Ideally, signage gets considered before the commercial lease is finalized. Why? Because the building may not allow the signage you have in mind.

A storefront might have:
• Strict landlord sign criteria
• Limited fascia space
• Existing raceways
• Heritage restrictions
• Restrictions on illumination
• Shared pylon panels
• Limited electrical access
• Municipal sign-area restrictions
• Architectural requirements
• No practical location for the sign you’re envisioning

If your brand depends heavily on a large illuminated storefront sign, you want to know whether that is possible before committing to the location. Ontario notes that commercial leases are negotiated contracts & there is no universal standard commercial lease. The lease can define specific rights & responsibilities between the tenant & landlord, including obligations related to improvements or use of the space.

Signage rights should therefore be reviewed as part of the lease, not assumed afterward.

Ask the Landlord About Signage Immediately

Before designing anything, ask the landlord or property manager for: The property’s sign criteria. Depending on the building, this might be a formal document or simply a set of requirements.

It may specify:
• Maximum sign dimensions
• Approved sign types
• Illumination requirements
• Raceway requirements
• Letter depth
• Mounting locations
• Approved colours
• Sign-band dimensions
• Window-graphic restrictions
• Pylon-panel dimensions
• Installation procedures
• Electrical requirements
• Required landlord approvals
• Removal obligations at the end of the lease

Some landlords maintain very strict signage standards. Others provide tenants much more flexibility. Either way, find out before paying someone to design a sign the property won’t approve.

Landlord Approval & Municipal Approval Are Different

This causes confusion constantly. Your landlord may approve the sign. That does not automatically mean the municipality has approved it. Likewise, obtaining a municipal sign permit doesn’t necessarily mean you’ve satisfied the signage provisions in your lease. Think of them as two separate layers.

Landlord Approval

The property owner may control things such as:
• Sign type
• Location
• Size
• Appearance
• Mounting method
• Raceway colour
• Illumination
• Window coverage
• Tenant-panel standards

Municipal Approval

The municipality may regulate:
• Sign area
• Height
• Projection
• Setbacks
• Number of signs
• Illumination
• Ground signs
• Electronic displays
• Structural requirements
• Permit applications

Both may need to be satisfied before fabrication or installation proceeds.

Don’t Assume the Previous Tenant’s Sign Means Yours Is Automatically Allowed

You’re moving into a unit. There’s already a sign above the door. So you assume. “We’ll just replace it with ours.” Maybe.

But the existing sign could:
• Have been installed under an older by-law
• Have different dimensions
• Have been approved under specific conditions
• Be grandfathered
• Be structurally unsuitable
• Have electrical problems
• Be owned by the landlord
• Need landlord authorization before alteration

A previous tenant having signage does not automatically establish that any new sign can go in the same location with any design. The existing conditions still need to be reviewed.

Determine What Existing Signage Can Be Reused

A new tenancy does not automatically mean every existing sign component needs to go into the garbage.

The previous tenant may have left behind:
• Channel-letter raceway
• Illuminated cabinet
• Backer panel
• Electrical feed
• Pylon tenant panel
• Window frames
• Mounting infrastructure
• Monument sign
• Interior directories

Some of that may have significant value.

For example:
If the storefront already has a functioning illuminated sign cabinet in good condition & your branding fits the proportions, a new sign face may be more practical than replacing the entire cabinet. Similarly, an existing pylon structure may only need a new tenant panel.

Before deciding on a completely new sign, determine:
What is already there & what is actually worth keeping?

Get a Sign Site Survey Early

commercial sign site survey
Photos are useful. Measurements are better. For straightforward projects, good photographs & landlord drawings may be enough to begin conceptual design. But permanent commercial signage often benefits from a proper site survey before production.

A survey can help confirm:
• Available sign area
• Building dimensions
• Existing signage
• Wall construction
• Mounting conditions
• Electrical access
• Sign-band dimensions
• Pylon-panel dimensions
• Installation height
• Lift access
• Underground conditions for ground signs
• Obstructions
• Interior access
• Existing penetrations

These details affect both the design & the price. A beautiful sign concept doesn’t mean much if it can’t practically be mounted to the building.

Don’t Trust Leasing Drawings for Final Sign Dimensions

Architectural or leasing drawings are useful references. They’re not always reliable enough for fabrication. Properties change. Cladding gets installed differently. Previous tenants modify things. Dimensions can vary from drawings. Final sign dimensions should be verified before fabrication where site conditions affect fit.

This is particularly important for:
• Sign cabinets
• Backer panels
• Window graphics
• Tenant panels
• Sign bands
• Door graphics
• Interior wall signs

Being wrong by an inch on a conceptual rendering isn’t a disaster. Being wrong by an inch on a fabricated panel that needs to fit inside an existing frame can be.

Decide What Your Primary Exterior Sign Needs to Accomplish

The main storefront sign has one primary job: Identify the business. New tenants sometimes try to make that one sign communicate everything.

They want:
Business Name Tagline
Phone Number Website
Five Services
Social Media Handle
“Now Open”

That’s usually too much. If customers primarily see the sign from the road or across a parking lot, prioritize recognition. Your main exterior sign should generally make it easy to answer: What business is located here? Secondary information can live elsewhere.

Common Storefront Sign Options for New Tenants

The correct sign depends on the building & brand.

Face-Lit Channel Letters

Individual dimensional letters illuminated through the front.

Common for:
• Retail
• Restaurants
• Medical clinics
• Service businesses
• Plazas

They provide strong nighttime visibility.

Halo-Lit Channel Letters

Opaque dimensional letters illuminated from behind. They can create a more architectural nighttime appearance.

Often used for:
• Professional services
• Hospitality
• Higher-end retail
• Medical
• Corporate properties

Non-Illuminated Dimensional Letters

A clean option when nighttime identification isn’t essential or illumination isn’t permitted.

Fascia Signs

Fabricated or panel-style signage mounted to the building.

These can incorporate:
• Dimensional lettering
• Printed graphics
• Routed elements
• Illumination
• Aluminum panels

Sign Cabinets

Illuminated cabinets can be particularly practical when:
• The building already has one
• The logo contains details that don’t translate well into channel letters
• Easy future face replacement is desirable

Backer Panels

Architectural panels can support dimensional lettering while:
• Creating contrast
• Covering old penetrations
• Helping accommodate mounting
• Hiding previous sign ghosting

Determine Whether You Have Pylon or Monument Sign Rights

For businesses located in plazas or multi-tenant developments, the storefront sign may not be the first signage customers see. The roadside sign may be more important.

Ask the landlord:
• Is a pylon panel included in the lease?
• What size is the panel?
• Is it illuminated?
• Who produces the panel?
• Who installs it?
• Is the landlord responsible?
• Are there design standards?
• Is there an additional charge?
• Is there currently an empty panel?
• Where will your business appear?

This matters.

A beautiful storefront sign hidden 300 feet from the road won’t help much if drivers don’t know the business is in the plaza.

Pylon Panel Design Should Be Simple

Tenant panels often become overcrowded.

Businesses try to include:
Logo
Tagline
Phone
Website
Services

on a panel being viewed from a moving vehicle. Strip it back. For most tenant pylon panels, your primary objective is: Brand recognition. The driver needs to recognize: “Yes, they’re in this plaza.” They do not need to read your entire marketing brochure from the road.

Plan Window Graphics at the Same Time

Window graphics are often treated as a separate project. For new commercial tenants, they should be planned alongside the exterior sign.

Possible window applications include:
• Logos
• Business hours
• Entrance identification
• Frosted privacy film
• Promotional graphics
• Full-colour graphics
• Perforated window film
• Decorative patterns
• Safety markings

The storefront should feel like one visual system. If the building sign is very bold, the window graphics may need to be restrained. If exterior signage opportunities are limited, the windows may need to carry more of the branding.

Don’t Cover Every Window Just Because You Can

New tenants get excited about empty glass. Suddenly every square foot becomes a branding opportunity. That can backfire.

Overly aggressive window coverage can:
• Make the business feel closed
• Reduce natural light
• Create visual clutter
• Compete with the main sign
• Violate landlord requirements
• Potentially conflict with local sign rules depending on application

Window graphics should have a reason.

Use them to solve:
• Privacy
• Identification
• Branding
• Information
• Visual impact

Not simply because the glass is empty.

Plan Door Graphics Early

Doors are usually where practical business information belongs.

Common door graphics include:
• Business name
• Hours
• Unit number
• Website
• Phone
• Entrance identification
• Accessibility information where applicable
• Required notices

That allows the main exterior sign to stay clean.

Again:
Primary sign = recognition.
Door/window information = details.

Interior Signage Should Be Part of the Opening Plan Too

Exterior signage gets most of the attention. Then opening day arrives & the reception wall is blank.

Depending on the business, interior signage may include:
• Reception logo
• Lobby wall sign
• Dimensional lettering
• Frosted office graphics
• Suite identification
• Door signs
• Room identification
• Directional signage
• Wall graphics
• Menus
• Directories
• Branded feature walls

If interior branding is part of the fit-out, coordinate it with:
• Paint
• Wall finishes
• Electrical
• Millwork
• Furniture
• Lighting

Don’t install expensive finished millwork & then discover there’s nowhere appropriate to mount the reception sign.

If You Want an Illuminated Interior Logo, Tell the Contractor Early

commercial signage construction planning
This is another detail that causes unnecessary headaches. A client decides late in the renovation that they want an illuminated reception logo.

But the wall is already:
• Finished
• Painted
• Tiled
• Built around custom millwork
• Closed with no accessible power

Now somebody has to figure out how to hide wiring. If illuminated interior signage is planned, coordinate power before the wall is finished. That gives everyone more options.

Electrical Planning for Exterior Signage Should Happen During Construction

The same applies outside.

If you’re installing illuminated channel letters, cabinets or other electric signage, determine early:
• Where power is available
• Who is responsible for electrical work
• Where the circuit terminates
• Whether interior access exists
• Where power supplies will be located
• Whether the sign requires a disconnect
• Whether the landlord has electrical requirements

It’s much easier to coordinate this while electricians & general contractors are already onsite. It’s much more expensive to rediscover finished walls afterward.

Make the Sign Company Part of the Construction Conversation

New tenant projects often involve:
• Business owner
• Landlord
• Property manager
• Designer
• Architect
• General contractor
• Electrician
• Millworker
• Sign company

If everyone works independently, details get missed.

Examples:
The architect draws channel letters.
The GC installs a wall assembly that makes mounting difficult.
The electrician puts power in the wrong location.
The landlord expects a raceway.
The sign company discovers all of this three weeks before opening.
A short coordination conversation early can prevent a lot of problems.

Don’t Assume the General Contractor Is Handling the Sign

If signage is listed vaguely as:
“by tenant” or “by others”

make sure you know what that means.

Who is responsible for:
• Sign design?
• Landlord submission?
• Permit application?
• Electrical feed?
• Engineering?
• Wall blocking?
• Sign fabrication?
• Installation?
• Lift rental?
• Existing-sign removal?
• Pylon panel?
• Inspection?
• Patching?

If nobody owns those items, they usually don’t magically happen.

Start Permit Review Before Fabrication

Municipal sign requirements vary across Ontario.

Depending on the municipality & proposed signage, approval may involve:
• Permit application
• Drawings
• Site plan
• Building elevation
• Sign dimensions
• Sign area calculation
• Construction details
• Engineering
• Property-owner authorization
• Fees

Don’t finish manufacturing the sign & then discover the municipality doesn’t permit the proposed size.

The order should generally be: Design → Review → Approval → Fabrication
not: Fabrication → Hope

For a detailed explanation, see our:
Commercial Sign Permits in Ontario: Everything Business Owners Need to Know

Businesses Near Provincial Highways May Have Another Approval Layer

For some Ontario properties, municipal approval isn’t the only consideration. Ontario states that signs or advertising devices located on property within 400 metres of a provincial highway right-of-way may require a provincial sign permit depending on the circumstances. If you’re opening a location along or near a provincial highway, this should be checked early. The province currently lists a standard service target of up to 30 business days for its sign-permit process, although the actual project can depend on application completeness & circumstances. That is another good reason not to begin permanent signage planning the week before opening.

Your Opening Date & Sign Installation Date Are Not the Same Thing

Businesses understandably want permanent signage installed before opening. Sometimes that works perfectly. Sometimes permit or construction schedules don’t cooperate. Instead of pretending the permanent sign will definitely be ready, plan for both:

Target A
Permanent signage installed before opening.

Target B
Professional temporary identification if permanent signage is delayed.

That could include:
• Temporary banner
• Window graphics
• Portable signage where permitted
• Temporary directional signs
• Printed panels

Temporary signage should still comply with applicable property & municipal requirements. But having a contingency plan is better than opening with a blank storefront & a sheet of printer paper taped to the door.

Temporary Signage Should Look Intentional

business opening day signage plan
“Temporary” doesn’t need to mean terrible. Your opening is when the public forms its first impression of the new location. If the permanent channel letters are still in production, a professionally produced temporary banner or window graphic can maintain the brand until installation.

Compare: COMING SOON — ABC DENTAL professionally printed & sized to the storefront versus: ABC DENTAL NOW OPEN printed on twelve sheets of office paper.

Only one of those says: We planned this opening.

Plan for Sign Removal Before Taking Possession

If the previous tenant left signage behind, determine who is responsible for removal.

The answer may be:
• Previous tenant
• Landlord
• New tenant
• General contractor
• Sign company

Don’t assume.

Sign removal can reveal:
• Holes
• Anchors
• Electrical wiring
• Ghosting
• Faded cladding
• Sealant
• Damaged wall material
• Hidden conduit

That can affect the design of the new sign. If possible, inspect the elevation after the old signage comes down before final fabrication.

Expect Sign Ghosting

A sign can protect the wall behind it from years of:
• Sunlight
• Dirt
• Weather
• Cleaning
• Fading

When the old sign comes down, its outline may remain. That’s called sign ghosting.
This becomes especially visible when the new logo is:
• Smaller
• Differently shaped
• Mounted in another location

Possible solutions include:
• Cleaning
• Painting
• Wall repair
• Replacing cladding
• Larger backer panel
• Adjusting new sign placement

This should be discussed before assuming the wall will look brand new after removal.

Coordinate Paint Before Installing Signage

If the exterior fascia is being repainted, determine whether that happens before or after sign installation. Usually, finishing the wall first produces a cleaner result.

Likewise, if an architectural backer panel is being installed, coordinate:
• Colour
• Paint code
• Finish
• Building materials

before sign production.

Don’t choose a “close enough” black from a screen. Materials & finishes can look very different in natural light.

Get Proper Logo Files Early

One of the easiest project delays to avoid:
Find the vector logo.

Useful formats often include:
• AI
• EPS
• SVG
• Vector PDF

A low-resolution logo pulled from:
• Instagram
• Facebook
• Email signature
• Website screenshot

may not be suitable for fabrication.

If the logo only exists as a poor-quality raster image, it may need to be recreated before signage production begins.

Do this early.

Your Logo May Need a Signage Version

Not every logo translates perfectly to physical signage.

Potential problems include:
• Thin strokes
• Tiny text
• Detailed icons
• Tight spacing
• Small taglines
• Complex gradients
• Fine outlines

A logo that looks excellent on a website may be difficult to fabricate as illuminated channel letters.

Possible adaptations can include:
• Removing a tagline
• Increasing stroke weight
• Separating the icon & wordmark
• Creating a simplified exterior version
• Using different fabrication methods for fine elements

The goal isn’t to redesign the brand. It’s to make sure the brand survives the transition from pixels to physical materials.

Determine Sign Size From the Customer’s Perspective

Don’t pick dimensions based only on:
What fits above the storefront.

Ask:
From where do customers need to recognize this business?

That could be:
• Sidewalk
• Parking lot
• Opposite side of road
• Intersection
• 200 feet away
• Moving vehicle

Viewing distance & road speed directly affect appropriate letter height.

See: How Big Should My Business Sign Be? Letter Height, Viewing Distance & Road Speed Explained

Don’t Automatically Copy the Neighbouring Tenant

You look at the storefront next door. They have 18-inch channel letters. So you assume: “We should get 18-inch letters too.” Not necessarily.

Their logo may have:
• Different proportions
• Wider strokes
• Fewer letters
• Better contrast
• Different illumination
• A simpler design

One tenant may need 18-inch letters. Another logo on the exact same sign band may need 24-inch letters to achieve comparable visibility. Design around your brand.

A New Tenant Should Think Beyond Opening Day

Permanent commercial signage can remain in place for years. Don’t optimize everything around: “What’s cheapest so we can get open?”

Think about:
• Brand longevity
• Future maintenance
• LED serviceability
• Tenant changes
• Sign-face replacement
• Material lifespan
• Updating business hours
• Future rebranding
• Ease of access

An extra decision made correctly during construction can avoid expensive work later.

Think About Service Access

Imagine your illuminated sign needs service three years from now. How is someone going to reach it?

Does it require:
• Ladder?
• Bucket truck?
• Boom lift?
• Swing stage?
• Interior access?
• Roof access?

Where are the power supplies? Can they be reached without dismantling the interior? A sign isn’t finished when it’s installed. Eventually, something may need servicing. Design accordingly.

What Signage Does a Typical New Commercial Tenant Need?

new commercial tenant signage options
Every business is different, but a full signage checklist might include:

Exterior

• Main building sign
• Channel letters
• Fascia sign
• Pylon tenant panel
• Monument tenant panel
• Secondary elevation signage

Windows & Doors

• Window graphics
• Privacy film
• Frosted vinyl
• Hours
• Door logo
• Unit number
• Entrance identification

Interior

• Reception logo
• Lobby signage
• Wall graphics
• Directional signage
• Room identification
• Suite numbers
• Menu signs
• Directories

Property

• Parking signs
• Directional signage
• Delivery signs
• Loading signs
• Pickup area
• Building identification

Temporary

• Coming Soon banner
• Now Open signage
• Construction signage
• Temporary directional signs

Not every tenant needs everything. The point is to identify the complete scope before deciding the job consists of: “One sign over the door.”

A Suggested Signage Timeline for New Tenants

Every project is different, but a strong planning sequence looks something like this.

12+ Weeks Before Opening

• Review lease
• Request landlord sign criteria
• Identify sign rights
• Select signage partner
• Review branding
• Photograph property
• Identify existing signage

8–12 Weeks Before Opening

• Complete site survey
• Develop initial concepts
• Confirm primary sign type
• Determine pylon/monument requirements
• Review electrical needs
• Coordinate with GC
• Obtain landlord feedback

6–10 Weeks Before Opening

• Finalize design
• Obtain landlord approval
• Prepare permit drawings
• Submit municipal applications where required
• Complete engineering if applicable
• Finalize electrical coordination

4–8 Weeks Before Opening

• Move approved signage into production
• Confirm site readiness
• Produce window/door graphics
• Confirm pylon panels
• Schedule installation equipment

2–4 Weeks Before Opening

• Complete interior branding
• Install window graphics where appropriate
• Confirm electrical readiness
• Confirm permanent-sign installation date
• Prepare temporary signage contingency

Opening Week

Ideally:
Permanent signage installed.
If not:
Temporary signage installed professionally while permanent approvals or production finish.

These are planning ranges, not guaranteed production or permit timelines. The more complicated the signage, the earlier the process should begin.

Signs That Usually Take More Planning

Certain projects deserve extra lead time.

New Pylons & Monuments

These can involve:
• Engineering
• Foundations
• Excavation
• Electrical
• Permits
• Underground utility considerations

Large Illuminated Channel Letters

Especially when:
• Building is high
• Installation access is difficult
• Custom fabrication is required
• Electrical routing is complicated

Digital Message Centres

These can have additional municipal restrictions & electrical requirements.

Heritage Properties

Additional approvals or design requirements may apply.

High-Elevation Signs

Specialized access equipment & scheduling may be required.

Multi-Location Projects

Each location can have different:
• Landlords
• Municipalities
• Site conditions
• Sign criteria

Start these earlier.

Don’t Order Signs Before the Lease Is Finalized

Planning is good. Fabricating too early isn’t.

Before committing to custom production, confirm:
• Lease is executed
• Location is secured
• Landlord approval path is clear
• Sign dimensions are verified
• Branding is final
• Applicable approvals are understood

Custom signage generally can’t simply be returned if the lease falls apart. Measure twice applies to paperwork too.

Who Should Manage the Sign Permit?

This varies between projects.

Possible parties include:
• Tenant
• Landlord
• Architect
• General contractor
• Sign company

What’s important is that someone clearly owns it. If everyone assumes someone else is applying, nobody is applying.

At the beginning of the project, establish: Who is responsible for the sign permit?
Then establish: Who is providing the required drawings & owner authorization?

What Should You Send a Sign Company for an Initial Quote?

To get a useful starting estimate, send:

Property Address

This allows the site & general context to be reviewed.

Building Photos

Take several angles, not one close-up.

Logo Files

Send vector artwork if available.

Landlord Sign Criteria

If you have it.

Existing Sign Information

Photos of anything being replaced.

Target Opening Date

This matters.

Desired Sign Type

If known.

If you don’t know the correct sign type, that’s fine. The property may make the decision clearer.

Don’t Start by Asking “How Much for a Sign?”

That’s like asking: “How much for a vehicle?” What kind? How big? New or used? Electric or gas?

Commercial signage is similar. Instead, provide the location & objective. A useful conversation is: “We’re opening a medical clinic at this address in November. Here’s the building, our logo & the landlord criteria. We need storefront identification, privacy graphics & a pylon panel.”

Now the project can actually be evaluated.

What Does New Commercial Signage Cost?

The cost depends heavily on the system.

A new tenant may spend relatively little on:
• Door graphics
• Window vinyl
• Existing pylon reface

while a project involving:
• Large illuminated channel letters
• Backer panel
• Engineering
• Permit
• Lift installation
• Interior branding

can be substantially more.

Factors include:
• Sign type
• Dimensions
• Materials
• Illumination
• Installation height
• Building construction
• Electrical work
• Existing infrastructure
• Engineering
• Permits
• Site access
• Number of signs

For detailed commercial signage pricing ranges, see our: 2026 Ontario Business Sign Cost Guide

The Cheapest Sign Is Not Always the Cheapest Opening Plan

Imagine Quote A is cheaper.

But it excludes:
• Permit
• Installation
• Lift
• Electrical
• Removal

Quote B costs more but includes the complete installed scope. Those aren’t comparable prices.

When reviewing signage estimates, identify who is handling:

Design
Fabrication
Permits
Engineering
Installation
Equipment
Electrical coordination
Existing-sign removal

The goal isn’t simply buying a sign.
The goal is getting the signage installed & operational.

Questions Every New Commercial Tenant Should Ask

Before approving signage, ask:
1. What signage does my lease allow?
2. Do I have a pylon or monument panel?
3. What are the landlord’s sign criteria?
4. What existing infrastructure can be reused?
5. Does my sign require a municipal permit?
6. Who is handling the permit?
7. Does the sign require engineering?
8. Where is electrical power coming from?
9. Is interior access available?
10. Has the sign location been physically measured?
11. Can customers actually see the proposed sign from the road?
12. What other signage do I need besides the storefront?
13. What happens if the permanent sign isn’t ready by opening day?
14. Who removes the previous tenant’s sign?
15. What will the wall look like after removal?
16. How will the sign be serviced in the future?

If you can answer those before production begins, you’re already ahead of most new tenant signage projects.

Frequently Asked Questions

How early should I order signage for a new business?

For permanent commercial signage, begin planning as early as possible once the location is reasonably certain. Projects involving landlord approval, permits, engineering, custom fabrication or electrical coordination should not be left until immediately before opening.

Do I need landlord approval for my business sign?

If you’re leasing commercial space, your lease or property rules may require landlord approval. Ontario commercial leases are negotiated contracts, so signage rights & obligations can vary significantly between properties.

Do I also need a municipal permit?

Potentially. Exterior commercial signs are commonly regulated by municipal sign by-laws, with requirements varying by city, sign type & property. Landlord approval does not substitute for municipal approval.

Can I use the previous tenant’s sign?

Sometimes.

Existing cabinets, pylons, electrical feeds, raceways or other components may be reusable if they’re in suitable condition & work with the new branding. They should be evaluated before production.

What if my permanent sign isn’t ready before opening?

Professional temporary signage can help identify the business until the permanent sign is installed, subject to applicable landlord & municipal requirements. This may include window graphics, banners or other temporary identification.

Should I put my phone number & website on the main sign?

Usually, the main exterior sign should prioritize business identification. Secondary information often belongs on doors, windows or other supporting signage where customers have more time to read it.

Who handles the sign permit?

It depends on the project. The tenant, landlord, general contractor, architect or sign company may handle it. What’s important is determining responsibility early.

Can the electrician install power before the sign is designed?

Power can sometimes be coordinated early, but the sign company should ideally provide requirements before final electrical locations are determined. Otherwise, the feed may end up in the wrong location.

Should I order window graphics with my exterior sign?

Planning them together usually produces a more cohesive storefront & helps prevent the windows from competing with the primary sign.

The Best Time to Plan Signage Is Before You Need It

The worst possible signage timeline looks like this:
Opening in three weeks.
No landlord approval.
No permit.
No measurements.
Logo isn’t finalized.
Electrician already left.
Old sign still installed.

At that point, options disappear quickly. A better process is:
Lease → Sign Criteria → Survey → Design → Landlord Approval → Permit → Fabrication → Installation → Opening

Not every project requires every step. But figuring that out early is what keeps signage from becoming the last-minute emergency.

At Elevated Signs Inc., we work with businesses, property managers, contractors & commercial clients across Brantford & Southwestern Ontario to coordinate commercial signage from the initial site review through fabrication & installation.

If you’re moving into a new commercial location, send us:
• The property address
• Your logo
• Building photos
• Landlord sign criteria if available
• Target opening date

We can review the site, determine what signage should be considered & help build the scope before the opening countdown becomes the deciding factor.

Because your signage shouldn’t be the thing holding up opening day.

Related Resources

Commercial Signage in Brantford, Ontario: Costs, Permits & Sign Options
How Big Should My Business Sign Be? Letter Height, Viewing Distance & Road Speed Explained
Face-Lit vs. Halo-Lit Channel Letters
Refacing, Retrofitting or Replacing an Existing Business Sign
Pylon Signs vs. Monument Signs
Channel Letters
Fascia Signs
Window Graphics
Commercial Sign Permits in Ontario
2026 Ontario Business Sign Cost Guide

Lease obligations, landlord criteria, municipal sign regulations & permit requirements vary by property. Businesses should review their individual lease, property requirements & applicable regulations before approving permanent signage.